Hertel Project

Project:
Hertel Project
Client:
Hydro – Quebec
Start Date – End Date:
2002 – 2003
Lattice Structure
Stats
0
kV
0
Ton
0
Miles (71 Km)
Project Highlights
  • This project formed part of the grid reconstruction following the 1998 Ice Storm in which over 1000 towers collapsed leaving 4 million people without power.
  • In accordance with heightened engineering standards following the storm, this project made use of special H-Frame Towers designed by Locweld to withstand extreme Ice Load conditions.
  • Aside from utilizing Locweld’s innovative tower design, this project also involved pouring larger tower foundations, using thicker transmission wires, and making every 10th tower an “anti-cascading tower” to prevent a repeat of 1998.